Internal combustion forklifts major maintenance projects can be divided in accordance with the late former run-in period before the truck maintenance, running and maintenance period, after the run-in period maintenance. Because of space reasons first introduced early run-maintenance, late tomorrow to continue.
Run-in period prior High Mast Diesel Forklift to maintenance, mainly to check the truck, ready to work before use. Mainly for the following items: clean vehicles, check and tighten the whole car outside the constituent bolts, Rum, pipe fittings, clamps and safety locking device, checking the whole car oil, water leaks phenomenon, lubricate the entire vehicle each lubrication points, check the tire pressure and wheel bearing tightness, check the steering wheel toe, Wheel Driving Diesel Forklift steering angle and steering systems for each component connections, check the adjustment of the clutch and brake pedal free travel and parking brake lever stroke operation, inspection braking performance brakes, check and adjust V-belt tightness, check the battery electrolyte level, density and load voltage, check the engine oil, gear oil, hydraulic oil, coolant fluid levels, check the instruments.
没有评论:
发表评论